LAB JOURNAL

The work, with its edges showing.

Build notes, research directions and the next useful test. Each entry keeps its date and evidence boundary.

28 OCT 2026
Priority development

LongLegs LL-1 enters engineering ↗

A purchasable 1/18 crawler becomes the basis for a compact inspection and search-support program. Its own package brings editable CAD, removable printed hardware, a full purchasing and wiring plan, and a non-actuating software bench. Fit, powered behavior and field trials remain separate physical gates.

22 OCT 2026
Owner update

Short Legs is on the bench ↗

Two owner photographs record camera, display and computer-cradle fit-up. More parts are needed before the planned first outdoor test; better photographs are a future update. Every other machine is presented as a concept at the same stage.

21 OCT 2026
Owner direction

Test the design before building its descendants ↗

The Evolution Lab direction connects parametric geometry, obstacle tests, failure analysis and eventual physical validation. Its first runnable unit is a paired suspension experiment.

19–21 OCT 2026
Recovered lineage

Two courses. Different questions. ↗

The Crawler Course and Road Course are separate research programs. Short Legs is the first field platform; the TT-02 road platform does not replace it.

NEXT DEFINED STUDY

See whether the comparison survives new terrain.

The planned C01 robustness study uses 20 new seeds at four nominal heights. Its 80 planned pairs are not a completed finding. Keep failed attempts alongside successes.

Physical comparison needs measured SL1 geometry, camera timing and qualified observations. A passive camera session alone does not validate vehicle dynamics.